top of page

BVK BROWN DEER

The project was located at the I-43 Brown Deer Rd Exit. We faced a real challenge building the ceiling 24’x24’ because the location of the lights made it difficult to follow the 24” O.C. sequence of the Chicago Grid Ceiling, but nothing is impossible and the objective was met. Many offices were also built, leaving the opening for the glass doors ready.

bottom of page